Earned Value Management Certification Test
Tests earned value management (EVM) skills — core measures of planned value, earned value and actual cost, variances and performance indices, forecasting with EAC, ETC, VAC and TCPI, and implementing an EVM system with WBS, control accounts, baselines and earned schedule — written to PMI's Practice Standard for EVM and the EIA-748 guidelines for 2026. Pass to earn Earned Value Management SOA-EARN.
- Intermediate difficulty.Assumes hands-on experience in the role.
- 20 scenario questions
- 20 minutes, timed
- 70% to pass · 90% for distinction
- Free no sign-up needed
- LinkedIn-ready · add it to your profile in one clickSee how ↓
What is the Earned Value Management Certification Test?
2026–2027 skills: planned value, earned value, CPI and SPI, EAC and ETC, and baselines and variance reporting.
The Earned Value Management Certification Test is a free intermediate-level, 20-minute skill test from Science of Apps. It tests earned value management (EVM) skills — core measures of planned value, earned value and actual cost, variances and performance indices, forecasting with EAC, ETC, VAC and TCPI, and implementing an EVM system with WBS, control accounts, baselines and earned schedule — written to PMI's Practice Standard for EVM and the EIA-748 guidelines for 2026. Score 70% or more on its 20 questions to earn a verifiable Earned Value Management certificate (SOA-EARN). Every question is based on published standards and research — including Practice Standard for Earned Value Management (Project Management Institute), EIA-748 Earned Value Management Systems guidelines (SAE International / NDIA) — and each answer is explained with its source.
Built for your job title
Project controls analyst, Project manager, Cost engineer, PMP candidate and Programme scheduler — and anyone who wants quick, verifiable proof of Earned Value Management knowledge for a CV or LinkedIn in 2026 and 2027.
- Project controls analyst
- Project manager
- Cost engineer
- PMP candidate
- Programme scheduler
What the test covers
Four skill areas with 5 questions each, drawn from a bank of 10 per area, so a retake brings questions you haven't seen.
- 01
EVM Fundamentals
25%- PV, EV and AC
- Budget at completion
- Percent complete
- 02
Variances and Performance Indices
25%- Cost and schedule variance
- CPI and SPI
- Interpretation
- 03
Forecasting
25%- EAC and ETC
- VAC
- TCPI
- 04
EVM System Implementation
25%- WBS and control accounts
- Baselines and change
- Earned schedule
Based on published standards
The questions are original scenarios, and each one names the public standard, official guide or research it draws on — shown under the question while you answer, and linked in your review. These are the sources behind this test:
Try a sample question
Earned value (EV) is
- the actual cost spent so far
- the budgeted cost of the work planned to date
- the budgeted cost of the work actually completed
- the total budget for the project
Show the answer
C. the budgeted cost of the work actually completed — Also BCWP. The real test has 20 questions like this.
How the test works
20 minutes, 20 questions
One question per screen, with a progress bar and a countdown. Your progress is saved on this device if you need to pause.
Graded on our server
Answers reach the page only after you submit, so the certificate can only be earned by passing.
Every answer explained
Pass or not, you see every question with the right answer, why, and the source behind it. Pass mark 70%, distinction 90%.
Your certificate
Founder-signed, with a QR code and credential ID. Download PDF or PNG, add to LinkedIn, and it's emailed to you.
What you earn

Pass, then add it to LinkedIn in one click
No typing. The Add to LinkedIn button opens your profile’s Licenses & certifications form already filled in: the certificate name, Science of Apps as the issuer, the issue date, your credential ID and a link recruiters can use to verify it.
- 1Take the 20-minute test
- 2Score 70% or more
- 3Click Add to LinkedIn

Earned Value Management
Science of Apps
Show credential ↗Try another skill test
- ProfessionalSOA-PM
Product Manager Certification
Certifies that you can run product well — discovery, strategy and prioritization, metrics, delivery with design and engineering, and launch.
Difficulty: IntermediateEarn Certified Product Manager → - LeadershipSOA-DL
Design Leadership Certification
Certifies that you can lead design — build and grow teams, set design strategy, run design operations, measure design's impact and influence the business.
Difficulty: AdvancedEarn Certified Design Leader → - ProfessionalSOA-PO
Agile Product Owner Certification
Certifies that you can do the product owner job in agile teams — Scrum roles and events, backlog ordering and refinement, user stories and acceptance criteria, and value-focused releases.
Difficulty: IntermediateEarn Certified Agile Product Owner →
Frequently asked questions
What is the Earned Value Management Certification Test?
The Earned Value Management Certification Test is a free intermediate-level, 20-minute skill test from Science of Apps. It tests earned value management (EVM) skills — core measures of planned value, earned value and actual cost, variances and performance indices, forecasting with EAC, ETC, VAC and TCPI, and implementing an EVM system with WBS, control accounts, baselines and earned schedule — written to PMI's Practice Standard for EVM and the EIA-748 guidelines for 2026. Score 70% or more on its 20 questions to earn a verifiable Earned Value Management certificate (SOA-EARN). Every question is based on published standards and research — including Practice Standard for Earned Value Management (Project Management Institute), EIA-748 Earned Value Management Systems guidelines (SAE International / NDIA) — and each answer is explained with its source.
How can I get a free Earned Value Management certification in 2026?
Take the free Earned Value Management Certification Test on Science of Apps. It tests planned value, earned value, and CPI and SPI against a 2026–2027 syllabus, and passing earns a verifiable certificate you can add to LinkedIn.
How do I take the Earned Value Management Certification Test for free?
Read the four skill areas on this page, then take the 20-minute test online — no fee, course or sign-up. You see every answer explained when you finish. Score 70% or more and you get a Earned Value Management certificate straight away, on screen, as a PDF and by email, with a credential ID anyone can verify.
Are the Earned Value Management Certification Test questions based on real standards?
Yes. The questions are original scenarios written by Science of Apps, and each one is based on a public source you can read: Practice Standard for Earned Value Management (Project Management Institute); EIA-748 Earned Value Management Systems guidelines (SAE International / NDIA). The source is shown under each question and linked in the answer review. Science of Apps doesn't copy questions from other tests.
What does the Earned Value Management Certification Test cover?
Four skill areas with five questions each, drawn from a bank of 10 per area so a retake brings new questions: EVM Fundamentals (PV, EV and AC, Budget at completion and Percent complete); Variances and Performance Indices (Cost and schedule variance, CPI and SPI and Interpretation); Forecasting (EAC and ETC, VAC and TCPI); EVM System Implementation (WBS and control accounts, Baselines and change and Earned schedule). Every question is an original scenario written to the 2026–2027 standard, with the published source named under it.
Who should take the Earned Value Management Certification Test?
Project controls analyst, Project manager, Cost engineer, PMP candidate and Programme scheduler. It suits anyone who wants a quick, verifiable way to show Earned Value Management knowledge in 2026 and 2027, from students and career switchers to experienced professionals.
What does earned value management measure?
EVM compares the value of work actually completed (EV) with the work planned (PV) and the actual cost (AC) to show schedule and cost performance and to forecast final cost and completion.
Where is EVM required?
Many US government contracts require an EVM system compliant with EIA-748 above certain thresholds, and EVM questions appear on PMP and PMI-SP exams.
Can I take the Earned Value Management Certification Test from any country?
Yes. The test is online, in English and free everywhere — people take it from India, the US, the UK, Europe, Africa, Latin America and Asia-Pacific. Your certificate is dated with your own local date and can be verified from anywhere at scienceofapps.com/certification/verify/.
How long is the Earned Value Management Certification Test?
20 questions — 5 from each of 4 skill areas — with a 20-minute limit. You need 70% (14 of 20) to pass and 90% for distinction.
How hard is the Earned Value Management Certification Test?
We rate it Intermediate: assumes hands-on experience in the role. It has 20 scenario questions — 5 from each of 4 skill areas — and a 20-minute limit. You need 70% (14 of 20) to pass and 90% for distinction.
How much do Science of Apps certifications cost?
Nothing. There is no fee to take a test, to receive the certificate, to have it emailed or to verify it, and no sign-up.
How are the tests graded?
On our server, not in your browser. The answers never reach the page until you submit, so a certificate can only be earned by passing. Each certificate gets a unique credential ID stored by Science of Apps.
What happens if I don't pass?
You see your score for each area and every question with the correct answer and why, with the published source behind it. You can retake after 30 minutes, and the retake draws questions you haven't seen yet.
Do the certificates expire?
No. Every certificate is dated, so it always shows when you passed. Retake a test any time for a newer date or a higher score.
Can I add the certificate to LinkedIn?
Yes. After you pass, Add to LinkedIn opens the Licenses & certifications form with the certificate name, Science of Apps as the issuer, the issue date, your credential ID and the verification link filled in. You can also download it as a PDF or PNG, and it's emailed to you as a PDF.
How can an employer verify my certificate?
Every certificate has a credential ID and a QR code. Scanning it, or entering the ID at scienceofapps.com/certification/verify/, shows the holder's name, the certification, the score and the issue date from our records.
Are these accredited qualifications?
No. They are Science of Apps' own assessments of applied skill. They aren't issued by a university or standards body, and they work best alongside a portfolio that shows the skills in real work.
1222 more certifications to collect
Product, Project Management & Business Analysis
- Product Manager Certification30 min · Intermediate
- Design Leadership Certification30 min · Advanced
- Agile Product Owner Certification30 min · Intermediate
- Product Strategy Certification30 min · Advanced
- User Onboarding & Retention Certification30 min · Intermediate
- Product Manager Interview Test15 min · Intermediate
- Product Discovery and Validation Certification15 min · Intermediate
- Product Roadmapping Certification15 min · Intermediate
- Product Prioritization and Trade-Offs Certification15 min · Intermediate
- Product Metrics and North Star Metrics Certification15 min · Intermediate
- Product-Led Growth Certification15 min · Intermediate
- Product Launch and Go-to-Market Certification15 min · Intermediate
- Technical Product Management Certification20 min · Advanced
- Product Operations Certification15 min · Intermediate
- Product Requirements and PRDs Certification10 min · Beginner
- User Stories and Acceptance Criteria Certification10 min · Beginner
- Agile and Scrum Fundamentals Certification10 min · Beginner
- Kanban and Flow Management Certification15 min · Intermediate
- Project Management Fundamentals Certification10 min · Beginner
- Risk, Scope and Schedule Management Certification15 min · Intermediate
- Stakeholder Management Certification15 min · Intermediate
- Business Analysis and Requirements Elicitation Certification15 min · Intermediate
- Business Process Modeling Certification15 min · Intermediate
- OKRs and Performance Management Certification15 min · Intermediate
- Strategic Decision-Making Certification20 min · Advanced
- Change Management Certification15 min · Intermediate
- Program and Portfolio Management Certification20 min · Advanced
- Business Case and ROI Analysis Certification15 min · Intermediate
- Jira & Confluence Administrator Certification Practice15 min · Intermediate
- PMP Practice Exam20 min · Advanced
- PRINCE2 Foundation & Practitioner Practice Exam20 min · Advanced
- Business Process Management (BPM) Certification15 min · Intermediate
- Balanced Scorecard Certification15 min · Intermediate
- Strategic Planning Certification15 min · Intermediate
- Consulting Case Interview Practice20 min · Advanced
- Scrum Master Certification Test20 min · Intermediate
- PSM I Practice Test20 min · Intermediate
- CSM Practice Test15 min · Beginner
- CAPM Practice Exam20 min · Intermediate
- PMI-ACP Practice Exam25 min · Advanced
- TOGAF Practice Test (TOGAF 10 Foundation)20 min · Intermediate
- CSPO Practice Test15 min · Beginner
- PgMP Practice Test (Program Management)25 min · Advanced
- Earned Value Management Certification TestYou're here
Foundation
AI & Generative AI
- AI UX Design Certification30 min · Advanced
- Prompt Engineering Certification30 min · Intermediate
- AI Product Manager Certification30 min · Advanced
Software Engineering & Web Development
- HTML and CSS Fundamentals Certification10 min · Beginner
- JavaScript Fundamentals Certification10 min · Beginner
- TypeScript Fundamentals Certification15 min · Intermediate
Data Analytics & Business Intelligence
- Product Analytics Certification30 min · Advanced
- Data Literacy Certification10 min · Beginner
- Microsoft Excel Fundamentals Certification10 min · Beginner
Digital Marketing, SEO, AEO & Growth
- Conversion Rate Optimization (CRO) Certification30 min · Advanced
- App Store Optimization (ASO) Certification30 min · Intermediate
- Growth Marketing Certification30 min · Intermediate
UX/UI, Design, Research & Creative
- UX Design Certification30 min · Intermediate
- UI Design Certification30 min · Intermediate
- Product Design Certification30 min · Intermediate
Cybersecurity, IT, Cloud & DevOps
- Cybersecurity Fundamentals Certification10 min · Beginner
- Security Awareness and Phishing Detection Certification10 min · Beginner
- Network Security Fundamentals Certification15 min · Intermediate
Sales, Customer Success & Support
- Sales Fundamentals Certification10 min · Beginner
- Consultative Selling Certification15 min · Intermediate
- B2B Sales Development Representative Certification10 min · Beginner
Human Resources & People Management
- Human Resources Fundamentals Certification10 min · Beginner
- Talent Acquisition and Recruitment Certification10 min · Beginner
- Technical Recruitment Certification15 min · Intermediate
Finance, Accounting, Operations & Entrepreneurship
- Financial Literacy for Professionals Certification10 min · Beginner
- Accounting Fundamentals Certification10 min · Beginner
- Bookkeeping Fundamentals Certification10 min · Beginner
Communication, Leadership & Transferable Skills
- Critical Thinking Test10 min · Beginner
- Attention to Detail Test10 min · Beginner
- Cognitive Bias Test10 min · Beginner
Languages
- English Level Test30 min · Beginner
- American Sign Language (ASL) Foundations Test25 min · Intermediate
- App & Software Localization Test25 min · Intermediate
Healthcare, Education, Legal Operations & Sustainability
- Healthcare Administration Fundamentals Certification10 min · Beginner
- Medical Office Administration Certification10 min · Beginner
- Healthcare Data Privacy Awareness Certification10 min · Beginner
Test Prep, Academics & Aptitude
- SAT Math Practice Test20 min · Advanced
- SAT Reading and Writing Practice Test20 min · Advanced
- ACT Practice Test (English, Math, Reading & Science)20 min · Advanced
Language Exam Prep
- IELTS Academic Practice Test with Band Score20 min · Advanced
- IELTS General Training Practice Test20 min · Advanced
- TOEFL iBT Practice Test20 min · Advanced
Office & Productivity Software
- Microsoft Word Skills Certification15 min · Intermediate
- Microsoft PowerPoint Skills Certification15 min · Intermediate
- Microsoft Outlook Skills Certification10 min · Beginner
Engineering, Architecture, Construction & Safety
- Mechanical Engineering Practice Test (FE-Style)20 min · Advanced
- Electrical Engineering Practice Test (FE-Style)20 min · Advanced
- Civil Engineering Practice Test (FE-Style)20 min · Advanced
Hospitality, Travel & Retail
- Hospitality Management Certification10 min · Beginner
- Food Safety Certification10 min · Beginner
- Hotel Revenue Management Certification15 min · Intermediate
Cognitive Ability & Pre-Employment Tests
- IQ Test20 min · Intermediate
- Numerical Reasoning Test20 min · Intermediate
- Verbal Reasoning Test20 min · Intermediate
Personality & Career Assessments
- Hogan Assessment Practice Test11 min · Beginner
- Big Five Personality Test10 min · Beginner
- Enneagram Test11 min · Beginner
Health, Fitness & Wellness
- Personal Trainer Practice Test (NASM, ACE & ISSA)20 min · Intermediate
- ACSM Practice Test (CPT & EP)20 min · Intermediate
- Yoga Teacher Certification Test (RYT 200)15 min · Beginner
Beauty & Cosmetology
Read before you test
- Career guidesProject risk, scope and schedule management skills employers want in 2027: risk registers, probability and impact, change control, baselines, estimation and schedule compressionProject risk, scope and schedule skills employers want in 2027: risk registers, probability and impact, change control, baselines, estimating and compression.
- Career guidesHow to get a project manager job in 2027: scope, schedule and budget, work breakdown structures, critical path, stakeholders, predictive vs agile and closing projectsHow to get a project manager job in 2027: scope, schedule, budget, WBS, critical path, stakeholders, predictive vs agile delivery, pay in India and US demand.
- Career guidesBusiness case and ROI skills employers want in 2027: costs and benefits, ROI, payback, NPV and the time value of money, sensitivity analysis, risks and recommendationsBusiness case and ROI skills employers want in 2027: costs, benefits, ROI, payback, NPV, time value of money, sensitivity analysis and clear recommendations.
- Career guidesExcel for financial and business analyst jobs in 2027: the modelling, scenario and variance skills interviews testExcel for financial and business analyst jobs in 2027: variance analysis, scenarios, forecasting, sensitivity tables, the modelling test and how to pass it.
- Career guidesBudgeting and forecasting skills for 2027 FP&A jobs: annual budgets, rolling forecasts, drivers and assumptions, variance analysis, scenario planning, cash forecasting and partnering with business teamsBudgeting and forecasting for 2027 FP&A jobs: annual budgets, rolling forecasts, drivers, variance analysis, scenarios, cash forecasts and business partnering.
- Career guidesHow to get a machine learning job in 2027: what ML hiring managers test, and the projects that prove you can shipHow to get a machine learning job in 2027: the ML fundamentals, coding and system-design skills employers test, the interview loop, pay and a 12-week plan.
Get the ideas, not the noise.
Sign up with Google and we’ll send you short UX psychology tips by email — why people tap, stall and leave, and what to do about it. Unsubscribe anytime. Prefer something to keep? Get the free Laws of UX guide as a PDF.
Founder, Science of Apps




